Verification and Documentation of Correction

After observing at the time of inspection a correction of a critical violation or deviation, the health department will enter the violation and information about the corrective action on the inspection report.

After receiving notification that the permit holder has corrected a critical violation or HACCP plan deviation, or at the end of the specified period of time, the health department will verify correction of the violation, document the information on an inspection report, and enter the report in the health department’s records.

The permit holder must correct noncritical violations by a date and time agreed to or specified by the health department but no later than 90 calendar days after the inspection. (The health department may approve a compliance schedule that
extends beyond these time limits if a written schedule of compliance is submitted by the permit holder and no health hazard exists or will result from allowing an extended schedule for compliance.)